Analisis Risiko Keselamatan Konstruksi Pada Proyek Rehabilitasi Puskesmas Secang 2 Berdasarkan Sudut Pandang Kontraktor

  • Firdamarsha Benadikta Universitas Islam Indonesia
  • Fitri Nugraheni Universitas Islam Indonesia
Keywords: Construction Safety, Contractor, Risk Analysis

Abstract

The accident rate of building construction projects in Indonesia reached 9 cases out of a total of 48 cases (20%) from 2017 to 2022. Out of these, 43 cases were attributed to technical negligence, 4 cases were due to natural factors, and 1 case is currently under investigation. Given the issues related to construction accidents, this research aims to identify construction safety variables that are likely to occur and subsequently conduct a risk level analysis. The research methodology employed is a case study, followed by a risk analysis based on the Ministry of Public Works and Housing Regulation No. 10 of 2021 regarding the Guidelines for Construction Safety Management Systems. The research findings indicate that out of 34 construction safety risk variables, there were 2 hazards (5.88%) classified as high risk (B), 22 hazards (64.71%) classified as medium risk (S), and 10 hazards (29.41%) classified as low risk (K).

References

Afriandina, N. Y., & Sutjahjo, K. D. (2022). Pengaruh Pengendalian Risiko Keselamatan Konstruksi Terhadap Kecelakaan Kerja Proyek X. Jurnal Teknik, 2(September), 1–12.
Arman, U. D., Sari, A., & Nasmirayanti, R. (2021). Analisis Resiko Keselamatan Konstruksi Pada Proyek Pembangunan Gedung Asrama Haji Padang Pariaman. Rang Teknik Journal, 4(1), 168–179. https://doi.org/10.31869/rtj.v4i1.2290
Hairi, M. M. J., Handayani, E., & Dwiretnani, A. (2022). Evaluasi Risiko Sistem Manajemen Keselamatan Konstruksi Berdasarkan Permen PUPR NO. 10 Tahun 2021 pada Pekerjaan Konstruksi Jalan. Jurnal Talenta Sipil, 5(2), 361–366. https://doi.org/10.33087/talentasipil.v5i2.139
Permen PUPR No. 10 Tahun 2021/PRT/M/2021, Kementerian Pekerjaan Umum dan Perumahan Rakyat 1 (2021). https://jdih.pu.go.id/detail-dokumen/2884/1#div_cari_detail
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge Fifth Edition (5th ed.). Project Management Institute, Inc.
Rizqika, A., Kustiani, I., & Siregar, A. (2019). Analisis Risiko Proyek Konstruksi Studi Kasus Bendungan Way Sekampung Paket 2 Dengan Metode Failure Mode and Effect Analysis dan Domino. JRSDD, 7(1), 549–558.
Saputro, C. D. (2022). Analisis Manajemen Risiko Proyek Bangunan Gedung Bertingkat Dengan Metode Severity Index. Jcebt, 6(2), 140–147. http://ojs.uma.ac.id/index.php/jcebt
Wibisono, B. (2012). Faktor-Faktor yang Berhubungan Dengan Kejadian Kecelakaan Kerja pada Pekerja Tambang Pasir Gali di Desa Pegiringan Kabupaten Pemalang Tahun 2013. http://dinus.ac.id/
Wijayanti, E. M. R., & Soeadyfa, D. A. (2018). Analisa Kegiatan Penyebab Risk and Hazard Terhadap Keselamatan Penerbangan Di Perum Lppnpi Cabang Balikpapan. Prosiding SNITP, September. http://ejournal.poltekbangsby.ac.id/index.php/SNITP/article/view/280
Yin, R. K. (2013). Case study research: Design and methods (Vol. 5). Sage.
Published
2024-01-03
How to Cite
Firdamarsha Benadikta, & Fitri Nugraheni. (2024). Analisis Risiko Keselamatan Konstruksi Pada Proyek Rehabilitasi Puskesmas Secang 2 Berdasarkan Sudut Pandang Kontraktor. Journal of Student Research, 2(1), 251-262. https://doi.org/10.55606/jsr.v2i1.2094